METHODOLOGY FOR CONSTRUCTION OF BOX CULVERTS

The project involves the supply and installation of NP-4 type reinforced concrete pipe culverts, with excavation and backfilling as per contract specifications. Key processes include pipe inspection, excavation in soft soil or below ground level, and pipe laying. Construction requires a concrete weigh batching plant, transit truck mixer, and crane. The Site Engineers will supervise all operations and maintain daily site records.