METHODOLOGY FOR CONSTRUCTION OF GSB

methodology for constructing a granular sub base (non-bituminous). It includes preparation of subgrade, equipment requirements such as a crusher and roller, and usage of crushed stone material. The procedure involves layering and compacting the material, checking and adjusting moisture content, and rolling until a specific compaction percentage is reached. Traffic arrangements during construction should comply with MORT&H 112.