METHODOLOGY FOR TURFING WITH SODS IN EMBANKMENT SLOPES

methodology for putting sod on embankment slopes. This involves preparing the slopes, procuring dense, well-rooted grasses indigenous to the locality, cleaning of undesirable materials, and trimming the sod to uniform width and thickness. The sods must be laid from the bottom upwards, moistened, and watered for four weeks post-installation.